Our building, consisting of 2 Flats and 2 Duplexes, has been completely renovated and two additional flats with a total area of 90 m² have been added to the building. In addition to these, a 72-ton reinforced concrete water tank has been built under the garden floor and a reverse osmosis purification system has been installed.